Construction Scope: Hefengtai display module R & D and manufacturing base project: clean room enclosure system; Clean room building, ground and column decoration; Anti static elevated floor; Deformation joint cover plate and accessories, fireproof sealing; Fire air system, process exhaust system, fan coil, AHU, Mau air conditioning system, FFU, dry coil DCC and warehouse air conditioning and smoke exhaust system on the first floor; Automatic sprinkler system and fire hydrant system; Municipal water supply CIW; Process pipeline; Power distribution of electrical lighting sockets and clean package facilities; FFU, Mau, DCC, Cr environment, process pipeline remote, PV and other facility monitoring systems (DC), and plant facility monitoring system (FMCS) is reserved; Fire, very early alarm, broadcasting, automatic storage system.Project Location: Xinzheng City